Selection of pipe foundations
Suitable locations for tubular foundations are identified, and the optimum tubular steel piles are chosen based on durability and accessibility.
Preparation and installation of tubular piles
Sites are prepared and tubular steel piles are driven deep into the ground using advanced vibratory techniques so they can be used directly for streetcar line poles.
Berlinerwanden supply and placement
Berliner walls, consisting of HEA sections, are delivered and vibrated high-frequency into the ground, with iron plates and slats for stability to the required depth.
Rounding and afstemming
Inspection and adjustments are made to ensure that all foundations and walls are perfectly matched to the requirements of the project.